Stantec chosen for design of Mississauga’s BRT corridor
The City of Mississauga has tapped Stantec to lead detailed the design and contract administration on the Dundas Bus Rapid Transit Mississauga East Corridor.
With more than seven kilometres of bus rapid transit (BRT) and eight stops, the project has an estimated budget of $580 million, which includes design and construction, land acquisition, and additional regional utility upgrades to be coordinated to increase construction efficiency.
“The Dundas BRT will provide direct connections to urban light rail and the wider regional transit network, connecting mobility hubs and enhancing transit services locally and regionally,” said Susan Walter, Stantec’s executive vice president of Infrastructure. “BRT solutions are a growing trend across North America, and we are excited to provide our expertise and support the City of Mississauga.”
In addition to the transportation work, Stantec will work with water engineering partner CIMA+ on approximately 12,500 metres of watermain and approximately 12,600 metres of wastewater main replacement, using a combination of trenchless tunneling and open-cut techniques. These works will be closely coordinated with roadway construction to minimize community disruption while optimizing cost and schedule outcomes.
The Dundas BRT Mississauga East project will be designed to increase service reliability, decrease travel time, and enhance transit ridership and satisfaction. It is a crucial part of the larger transit expansion in the region, supporting transportation demand and Metrolinx’s 2041 Regional Transportation Plan, which is designed to promote economic growth, support increased housing supply, and create jobs. The project also aligns with the City of Mississauga’s 2018 Dundas Connects Master Plan, supporting urban growth while addressing environmental commitments and community interests.
“Mississauga is experiencing significant growth in its rapid transit system, driven by increased transit and housing demands, and a commitment to sustainable urban development,” said Sam Rogers, Commissioner of Transportation and Works, City of Mississauga. “We look forward to collaborating with Stantec to deliver this priority project for the residents and businesses in Mississauga.”
The Dundas BRT Mississauga East design will include dedicated median bus lanes and use Intelligent Transportation Systems for optimized signal timings and transit priority for fast, reliable service. It will introduce new and upgraded stops equipped with improved accessibility for all passengers.
Stantec will provide consulting, design, tender preparation, procurement support, construction, post-construction, and maintenance period administration services. Works will also include significant utility relocation coordination, permitting, and approvals facilitation. The project will include environmentally friendly practices and materials to minimize the project’s carbon footprint.